This team focused on the development and the built results of a form-based code applied to the intersection of Whetsel Ave and Bramble Ave. The essence of the code was presented architecturally through a series of drawings and perspective renderings. The team explored different approaches to the final built form of the intersection taking into account aspects of their study of form-based code, such as relation to the street, architectural character and building setbacks. Back to all Urban Design and Implementation Strategies. Back to all Great Streets and Gateways projects. |