UC's Teachers College/Dyer Hall to Undergo Renovations and Improvements
The
College of Education, Criminal Justice, and Human Services
(CECH) is pleased to announce renovation plans for the Colleges building Teachers College/Dyer Hall on the University of Cincinnatis Uptown West Campus, after receiving Board of Trustees approval.
Bringing together UCs Schools of Education, Criminal Justice, Human Services, and Information Technology, Teachers College/Dyer Hall provides a base for more than 130 CECH faculty members and 5,500 undergraduate and graduate students. The building also supports a number of UC students, as 25 percent of students take a least one class in Teachers College/Dyer Hall during their time at the university.
A full building renovation was first approved in 2003 as a comprehensive plan to renovate the Teachers College/Dyer Hall complex. Subsequently, the renovation was divided into two phases (Phase 2 and Phase 3). Phase 1 was an earlier renovation project completed in 2001 that renovated 7,000 square feet of classroom and office space on the 500 level, added a new elevator, and made various ADA upgrades and HVAC improvements. The Phase 2 renovation was completed in 2008 and completely modernized the original Teachers College portion of the complex.
The current Phase 3 renovation project will address the need to update the Teachers College Addition and all of Dyer Hall first built in 1931 and later joined to Teachers College in 1957 while cleaning and preserving the neoclassical features of the building. Champlin Architecture, who was the architect for the Phase 2 renovation of Teachers College, will also complete this phase, which is slated to start in fall 2014 and will complete the much needed unification of the complexs functionality and design.
In addition to updating the building for 21st Century learning, we will improve critical, core building systems that have reached the end of their useful life, including the heating, ventilation, air conditioning, electrical system, plumbing, and telecommunications systems, said Greg Hollon, a program director who is leading the building rehabilitation project. These systems have not been updated in decades and will help drive energy efficiency, among other benefits.
The renovated building will also feature abundant natural light in a new, two-story atrium that will serve as the buildings new main entrance. The building is expected to be LEED Silver certified, generating significant energy efficiencies. According to the U.S. Green Building Council, LEED certified buildings cost less to operate, reducing energy and water bills by as much as 40 percent.
As well as making necessary upgrades to the buildings HVAC, plumbing, and electrical systems, the two-year renovation is expected to be completed in summer 2016 and will add the following to the building:
- Five classrooms, bringing the total to 10; the building will also keep its 14 labs
- A 120-seat auditorium with handicap accessibility;
- Two new elevators, bringing the total to four
- A small coffee shop;
- Digital and multimedia capabilities in all classrooms
- A science lab complete with a fume hood, sinks, chemically resistant countertops, and prep areas
- New bathrooms on every floor; those on the 1st and 2nd floors will have limited-access showers
- New conference rooms with the latest video conferencing equipment
- Relocation of all HVAC systems to the roof, thereby creating interior space for other uses
- Specialized labs for math, science, information technology, American Sign Language, literacy, and pedagogy;
- An outdoor classroom in the courtyard
- New landscaping, outdoor seating areas, and outdoor lighting
- A video studio
- Digital signage throughout the building
- A more centrally located three-bay loading dock
- A multi-functioning meeting and conference room named in honor of Elizabeth Dyer, former dean and education pioneer, and given by her sorority Chi Omega to honor Dyers legacy to the sorority and to education;
Beginning in May, CECH faculty and staff offices will be moved to the Student Residential Hall of the Campus Recreation Center (CRC). Those CECH offices not moving to the CRC the CECH Office of the Dean, Business Office, Marketing and Development Office, and the Student Services Center will remain in Teachers College/Dyer Hall during the renovation. Additionally, the 7th floor of Edwards 1 will become a Mac Lab for CECH.
No summer classes will be held in Teachers College/Dyer Hall. CECH classrooms and labs will be moved throughout the summer to structures where Wilson Auditorium used to be located, Clifton Court Pavilion North and South. These structures will house CECH classrooms and labs during the renovation. The structures also will be equipped with WIFI as well as two lounges, one for faculty and one for students.
Related Stories
CNN Business: Best Buy’s simple strategy for beating shoplifting
November 30, 2023
The Best Buy approach to thwart shoplifting is to increase staffing. It's a move that UC criminologist John Eck says, in a CNN Business article, that makes perfect sense. It's also a different approach at a time when most retailers are reducing staff.
UC student teams cracking codes for change at MakeUC event
November 15, 2023
Within the sleek confines of 1819’s cutting-edge technology, an army of overnight hackers unleashed a wave of innovation, turning laptops into digital canvases and transforming the ESports Innovation Lab into a virtual battlefield. In the Makerspace’s hidden lair, 3D robotic models were forged — all for a good cause.
Local 12: How to protect yourself from gift card scams
November 13, 2023
Shoppers who plan to purchase gift cards need to be vigilant to avoid becoming the victim of a scam, Local 12 reported.