Power Outage at Reading Campus Planned for Friday, Nov. 23
Maintenance & Operations advises that on Friday, Nov. 23, Duke Energy will have a planned power outage from 3 a.m. to 8 p.m. to repair the substation supplying electric power to the entire Reading Campus. Emergency backup power will be operating during the outage.
Jim Miller, facilities manager, will need to know from the Reading Campus community any special power needs during that time (other than items already submitted). Please notify him (email millerjg@ucmail.uc.edu) of the following:
- Type of equipment and power needs.
- Building name, room number, location in room.
- Contact person's name and a good phone number.
This information is needed no later then noon Friday, Nov. 16.
Tags
Related Stories
UC experts say proper produce washing is key defense against Cyclospora
July 17, 2026
Hamilton County Public Health reports confirmed cases of cyclosporiasis, as concerns persist. Cyclospora is a parasite that can cause a stomach illness lasting days — sometimes even weeks. University of Cincinnati medical experts say it is usually linked to contaminated water or food, often fresh produce.
UC students organize free health clinic in community
July 15, 2026
The University of Cincinnati student chapter of Remote Area Medical held its annual free health clinic July 11-12 at St. Xavier High School. Medical, dental and vision care was offered to adults and children, with no income requirements or insurance needed.
University of Cincinnati advances FLASH radiation therapy with new clinical trial
July 15, 2026
UC Cancer Center researchers led the FAST-02 trial, showing ultra-high-dose-rate FLASH proton therapy near the heart and lungs safely reduced pain from thoracic bone metastases.