Electrical Shutdown in Part of MSB from 3 to 5 a.m. Wednesday, Sept. 3
An electrical shutdown will occur in part of the Medical Sciences Building (MSB) from 3 to 5 a.m. Wednesday, Sept. 3, 2014. This shutdown is necessary to make the last major electrical tie-in for Phase IV of the MSB Rehabilitation Project.
The shutdown will affect all non-emergency lighting, receptacles and power in the MSBs southwest quadrant (south of the main building elevators and west of the main north/south corridor) from Levels R through 2 and all levels of MSB Receiving including freight elevators and mechanical equipment.
Emergency power will not be affected, and emergency lighting will be present for means of egress.
Tags
Related Stories
UC students organize free health clinic in community
July 15, 2026
The University of Cincinnati student chapter of Remote Area Medical held its annual free health clinic July 11-12 at St. Xavier High School. Medical, dental and vision care was offered to adults and children, with no income requirements or insurance needed.
University of Cincinnati advances FLASH radiation therapy with new clinical trial
July 15, 2026
UC Cancer Center researchers led the FAST-02 trial, showing ultra-high-dose-rate FLASH proton therapy near the heart and lungs safely reduced pain from thoracic bone metastases.
New UC Center for Alzheimer's and Neurodegenerative Diseases Research to advance dementia research, treatment and education
July 14, 2026
The University of Cincinnati and UC Health are launching the Center for Alzheimer's and Neurodegenerative Diseases Research (CANDR) to advance dementia research, clinical care and brain health education.