Domestic Water Shutdown in Reading Campus Building E Nov. 23

Reading Campus facilities management will have a domestic water shutdown to Building E from 6 a.m. to 6 p.m. Sunday, Nov. 23, Maintenance & Operations reports. 

The shutdown will affect all water to restrooms, lab sinks, drinking fountains and ice machines. It will not affect reverse osmosis (RO) water, systems using RO water, safety showers and emergency eye wash stations.

The shutdown is needed to repair a leaking water line to the building on the ground floor. 

Please contact Jim Miller at 513-558-3554 with any questions and concerns. 

Tags

Related Stories

1

UC students organize free health clinic in community

July 15, 2026

The University of Cincinnati student chapter of Remote Area Medical held its annual free health clinic July 11-12 at St. Xavier High School. Medical, dental and vision care was offered to adults and children, with no income requirements or insurance needed.