Repair Work Will Limit MSB/CARE Access Saturday, Feb. 28

Contractors will be at the Medical Sciences Building Saturday, Feb. 28, 2105, to replace the broken office window that faces the Atrium - Room 2005F. (This work was originally scheduled for Saturday, Feb. 21, but was rescheduled.)

The contractors will also be replacing glass panels on two of the CARE/MSB bridges. The work will begin at 7 a.m. and should end by 5 p.m. 

There will be no access to the Atrium area, connecting bridges, Health Sciences Library on Levels G and 1 facing the Atrium, outside entrances, stairways and other possible ways to enter the construction space during this time. To gain access to labs in CARE and the Fitness Center at CARE/Crawley, enter through the exterior door near Subway and use the CARE elevators. Access to MSB from CARE or CARE exterior entry doors will not be available.

Please pay attention to routing signs and caution tape during this activity. If you have questions, call Don Becker at 513-556-4734 or Ken Bloomer at 513-556-0605.

Tags

Related Stories

2

Heavy social media use linked to depression

August 31, 2026

U.S. News and World Report, Yahoo! News, MSN, USA Today and other national media highlight a new study by the University of Cincinnati and Northwestern University that found a correlation between heavy social media use and depression in adults.