Repair Work Will Limit MSB/CARE Access Saturday, Feb. 28
Contractors will be at the Medical Sciences Building Saturday, Feb. 28, 2105, to replace the broken office window that faces the Atrium - Room 2005F. (This work was originally scheduled for Saturday, Feb. 21, but was rescheduled.)
The contractors will also be replacing glass panels on two of the CARE/MSB bridges. The work will begin at 7 a.m. and should end by 5 p.m.
There will be no access to the Atrium area, connecting bridges, Health Sciences Library on Levels G and 1 facing the Atrium, outside entrances, stairways and other possible ways to enter the construction space during this time. To gain access to labs in CARE and the Fitness Center at CARE/Crawley, enter through the exterior door near Subway and use the CARE elevators. Access to MSB from CARE or CARE exterior entry doors will not be available.
Please pay attention to routing signs and caution tape during this activity. If you have questions, call Don Becker at 513-556-4734 or Ken Bloomer at 513-556-0605.
Tags
Related Stories
UC students organize free health clinic in community
July 15, 2026
The University of Cincinnati student chapter of Remote Area Medical held its annual free health clinic July 11-12 at St. Xavier High School. Medical, dental and vision care was offered to adults and children, with no income requirements or insurance needed.
University of Cincinnati advances FLASH radiation therapy with new clinical trial
July 15, 2026
UC Cancer Center researchers led the FAST-02 trial, showing ultra-high-dose-rate FLASH proton therapy near the heart and lungs safely reduced pain from thoracic bone metastases.
New UC Center for Alzheimer's and Neurodegenerative Diseases Research to advance dementia research, treatment and education
July 14, 2026
The University of Cincinnati and UC Health are launching the Center for Alzheimer's and Neurodegenerative Diseases Research (CANDR) to advance dementia research, clinical care and brain health education.