Repair Work Will Limit MSB/CARE Access Saturday, Feb. 28

Contractors will be at the Medical Sciences Building Saturday, Feb. 28, 2105, to replace the broken office window that faces the Atrium - Room 2005F. (This work was originally scheduled for Saturday, Feb. 21, but was rescheduled.)

The contractors will also be replacing glass panels on two of the CARE/MSB bridges. The work will begin at 7 a.m. and should end by 5 p.m. 

There will be no access to the Atrium area, connecting bridges, Health Sciences Library on Levels G and 1 facing the Atrium, outside entrances, stairways and other possible ways to enter the construction space during this time. To gain access to labs in CARE and the Fitness Center at CARE/Crawley, enter through the exterior door near Subway and use the CARE elevators. Access to MSB from CARE or CARE exterior entry doors will not be available.

Please pay attention to routing signs and caution tape during this activity. If you have questions, call Don Becker at 513-556-4734 or Ken Bloomer at 513-556-0605.

Tags

Related Stories

2

Funding expands UC research into weight gain side effects of bipolar medication

August 26, 2026

University of Cincinnati researchers have been approved for funding by the Patient-Centered Outcomes Research Institute (PCORI) to expand the implementation of healthy lifestyle interventions and metformin prescription to help manage weight gain in overweight or obese youth taking second-generation antipsychotic medications.

3

One in four NFL players had CTE at death

August 25, 2026

Forbes cites research on concussions and football helmets by the University of Cincinnati in a report that found one in four NFL players had brain damage at death.